GOVERNMENT:
FEDERAL

Projects in Collaboration with ECC International, LLC
  • Project 5910:  As-Built Drawings - Abroad
PHASE: Complete
  • Project 5999:  Design, detailing and scheduling of Misc. Steel Shop Fabrication, Ballistic Penetrations Sleeves/Plates, Seismic Hangers, and procurement - Abroad
PHASE: In-Progress

LOCAL

Nueces Electric Co-op - Robstown, Texas
Development of shop fabrication drawings of the Mechanical (including Piping), Fire Protection, and some Electrical Systems for a 36,139 s.f. Administration Building, in collaboration with Miller and Miller Mechanical and Fulton Coastcon Construction.

 PHASE: Complete

Joe Gulley Park - Kenedy, Texas  
Additions and Renovations to Existing Facilities, including new outdoor basketball court.

PHASE: Construction Documents


Fire Station No. 50 - San Antonio, Texas  
A New 12,670 s.f. Fire and EMS Station (3 Fire Bays and 1 EMS Bay) on the south side of San Antonio.
Position:    Project Architect/Manager/Designer
Company:    WestEast Design Group (San Antonio)

PHASE: Complete